Roof Replacements in Bedford
Full re-roofs across Bedford, stripped back to the rafters and rebuilt with new membrane, battens and tiles or slate. Every new roof carries our 20 year insurance backed guarantee.
- 20 year insurance backed guarantee
- Around five days on a typical semi
- Dry fix ridges and verges
- Insulation upgraded while it is open
What a full re-roof includes
Re-roofing is a bigger job than any repair, so it pays to use a roofing contractor in Bedford who takes care of every part of it. This is what goes into one of our new roofs.
Stripped to the rafters
Old tiles or slates, battens and felt come off, so nothing tired is left under the new roof.
Structural checks
With the covering off, rafters and timbers are checked and any rot or damage is put right.
New breathable membrane
A modern membrane lets moisture escape from the loft while keeping rain out.
New battens
Fresh battens set out for your tiles or slate and fixed in line with British Standards.
Tiles or slate
Clay, concrete or natural slate to suit the house and the street.
Dry fix ridges and verges
Mechanically fixed on every new roof, so there is no mortar to crack and wash out.
Insulation and ventilation
Brought up to date while the roof is open and access is easy.
Scaffold
Put up around the house for safe access and taken down once the roof is finished.
How long a re-roof takes
Expect around five days to re-roof a typical semi, weather permitting. Larger houses, hipped roofs and roofs needing timber repairs can take longer.
-
1
Scaffold goes up
Safe access is set up around the house before any tiles come off.
-
2
Strip and check
The old covering is removed and the timbers underneath are inspected.
-
3
Membrane and battens
The roof is made weathertight with new membrane, then battened out.
-
4
Tiles or slate
The new covering goes on, followed by dry fix ridges and verges.
-
5
Scaffold down and clear up
The site is cleared and the scaffold is taken away.
Building regulations and your new roof
On a full re-roof, the council's building control team normally needs to approve the work. They inspect it and issue a completion certificate, which you should keep safe for when you come to sell the house.
Guaranteed for 20 years
Your new roof comes with a 20 year guarantee on our workmanship, backed by insurance. Because of that insurance backing, your cover is designed to stay in place for the full term regardless of what happens to the firm that did the work.
Solar panels on the roof?
Panels have to come off before the roof underneath can be replaced. We coordinate solar panel removal and refitting as part of the job.
Not sure you need a new roof yet?
A new roof is a big decision. Our guides for homeowners cover how to tell when a roof needs replacing, how long the work takes and what the rules say. If you are weighing up tiles against slate, our guide to how long different roof coverings last compares them.
Get a price for a new roof
We survey the roof and price the full re-roof at a fixed rate, with everything included spelled out.
Roof replacement questions
How long does a roof replacement take?
Around five days for a typical semi, weather permitting. Bigger houses, complex roof shapes and timber repairs found once the roof is stripped can add time.
Can I stay in the house while the roof is replaced?
Yes, you can normally stay at home throughout. Each section is covered with membrane soon after it is stripped.
Do I need building regulations approval for a new roof?
A full re-roof normally does. The council's building control team inspects the work and issues a completion certificate when it is finished.
What guarantee comes with a new roof?
Every new roof we fit is covered for 20 years by our workmanship guarantee, which is insurance backed.
What happens if the timbers are rotten?
Any rotten or damaged timber found once the covering is off is repaired before the new roof goes on.
Time for a roof that lasts?
Book a free survey for your re-roof and get a fixed price.