The short answer

Taking solar panels off for a new roof needs two trades. An electrician isolates the system and later recommissions it. A roofer removes the panels, rails and hooks, replaces the roof and remounts everything. The job runs most smoothly when one firm coordinates both.

Why this is becoming common

Many homes had solar panels fitted to roofs that had already used up a good share of their life. As those roofs reach the point of replacement, the panels have to come off first. The same question comes up for anyone planning solar on an ageing roof and trying to work out which job should come first.

Two trades, one job

The roofing and the electrical work are separate skills. A qualified electrician makes the system safe before anything is touched and brings it back into service at the end. A roofer handles everything on the roof: the panels, the rails, the hooks and the new covering. Problems arise when the two are booked separately and nobody owns the gap between them, such as who stores the panels or who makes good the fixing points.

The process

  1. Isolation and disconnection. The electrician isolates the system so the panels can be handled safely.
  2. Panels and rails off. Panels are unclamped and lowered, then the rails are taken down.
  3. Hooks out. The roof hooks are removed as the old covering is stripped.
  4. The new roof. The new covering goes on, with the positions for the hooks worked out as it is laid.
  5. Remount. New or existing hooks go into the rafters, then the rails and panels go back up.
  6. Recommissioning. The electrician brings the system back into service and confirms it is producing power.

Scaffold and timing

One scaffold should serve the whole job, from taking the panels down to putting them back up, so the removal, the re-roof and the refit need planning as one sequence. The system produces nothing while the panels are off, so a well organised job keeps that gap short. Spring and summer jobs cost the most in lost generation, which is worth weighing up if you have a choice of dates.

Choosing who does it

Ask anyone quoting who will isolate and recommission the system, where the panels will be kept, who removes and makes good the hooks and who is responsible if a panel is damaged. A single firm coordinating the roofer and the electrician avoids the gaps where things go wrong.

Paperwork to keep

Keep the original installation documents, the electrician's records from the removal and recommissioning and the guarantee for the new roof together. Buyers and their solicitors will ask for them when you sell.

Storage and handling

Panels are more fragile than they look. Knocks and flexing can cause tiny cracks in the cells that are invisible but reduce output over time. They should be handled carefully, kept padded and stored somewhere safe and dry while the roof is being replaced, as the panel manufacturer advises.

Warranty and certification

Taking panels off and putting them back can affect the installer's workmanship warranty and the panel manufacturer's warranty. The system's certification and paperwork matter too, especially when you sell the house. Check your documents before work starts and keep a record of who removed and refitted the system.

Roof first, almost always

If you are getting quotes for solar on a roof with under ten years left, challenge any installer who says it does not matter. Paying for scaffold, removal, storage and refitting a few years after installation usually costs far more than replacing the roof first. Our guide on whether a roof is ready for solar explains how to judge it.

Should you upgrade while the panels are off?

With the panels already down, some owners take the chance to add more or replace older, less efficient ones. That can make sense. A changed system may, however, need a new design, new certification and notification to the network operator, so plan it with the electrician before the roof work starts.

Panels in the way of a new roof?

Our solar panel removal and refitting service takes care of the whole job, from isolation to recommissioning, with the roof replacement in between. One team, one scaffold and one point of contact.

Further advice sits in our solar hub.

Solar panel removal questions

Can a roofer remove solar panels?

A roofer can take down the panels, rails and hooks and refit them. The system itself must be isolated and recommissioned by a qualified electrician, so the two need to work together.

Will removing my solar panels affect the warranty?

It can. Check the installer's warranty and the panel manufacturer's terms before anything comes off.

Can I upgrade my panels while they are off?

You can. New or extra panels may need a new design, new certification and notification to your network operator.

Should I fit solar before or after replacing my roof?

If the roof has limited life left, replace it first. Taking panels off later adds cost that doing the roof first avoids.